More dozer work
Here are just some more pictures of some fine work.
Pond Redo
This pond just needed the dam brought up and refaced. It was also cut a little deeper.
Just more pad work
This pond dam had trees all over it and a hole trough the dam. The hole was draining the pond down four feet below were the water level should be a full stage. 35M Dozer removed the trees and got down to the hole and repaired it, we also dressed up the spill way that had washed out over time.
Trees are a pond dams enemy. Do not let trees grown on your dam, just a tip.

digging down


We got the hole dug down to, thats a big hole in that dam.
Dam and spillway all fixed up. Bring on the rain.

